Traffic Alert: Lane Closures Resume At I-39/90/94 Wisconsin River Bridges

Posted Friday, September 7, 2012 --- 11:25 a.m.

From the Department of Transportation:

Work has resumed on the northbound I-39/90/94 bridge at the Wisconsin River in Columbia County. Traffic will be reduced to four lanes until November. Two lanes of traffic in each direction will use the southbound span during construction. The northbound bridge will be closed for maintenance and resurfacing.

The section of I-39/90/94 north of Madison is one of the busiest stretches of Interstate highway in Wisconsin and used heavily by recreational travelers and the freight industry to reach Wisconsin Dells and points north. Motorists are advised to plan ahead and anticipate delays during peak travel times, particularly northbound on Friday afternoons and southbound on Sunday afternoons.

Motorists are encouraged to dial 511 or visit www.511wi.gov for up-to-the-minute information on highway and travel conditions in Wisconsin.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
NBC15 615 Forward Drive Madison, Wisconsin 53711 Business: 608-274-1515 Newsroom: 608-274-1500
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 168927736 - nbc15.com/a?a=168927736